Studies of Construction of Corridor Comprehensive Gulf Comprehensive Lines are being implemented

Economic studies

Hormozgan Ports and Maritime Director General: Initially, the companies will be connected to these lines and according to the plan, in the future, all oil investment companies located in Shahid Rajaee Port will benefit from these lines.: With the construction of the Corridor of the Gulf Port Comprehensive Lines in addition to increasing the volume of operations Discharge and loading of petroleum products, The productivity of the docks has also increased, and consequently we will see a decrease in the durability of vessels in the harbor..

 

Market Studies

Mohammadi Karaji Ron, Providing a suitable basis for better service to private sectors in Import and export of petroleum products Based on valid standards, he added other goals of the plan.: By connecting all investor companies to the rail discharge and loading area in Shahid Rajaee Port, the transfer of a variety of light and heavy products through the rails to the tanks based Gulf Port It will be possible. By organizing and constructing new lines, it is possible to accept large -size vessels and connect to the Persian Gulf port tanks and the result is the increase in market share in the region. Mohammadi Karaji expressed hope.: By executing this plan, the possibility of connecting Oil Refinery The Persian Gulf Star and Bandar Abbas Refinery will be provided directly to the oil reservoirs in Shahid Rajaee Port.

Investment advice

“Gulf Oil Port” In the Shahid Rajaee Bandar Abbas port complex, there are 2 pier posts of 1 and 2 meters and average depth of 1.5 meters and 2 hectares of support and support lands and due to strategic location, being located on the north -south transit route and proximity to the region's industries and refineries. Gasoline, gas oil, furnace oil, bitumen, kerosene, hydrocarbons, forces and types of oils are carried out and from future plans in the Persian Gulf Port to build 1,000 -thousand docks and unloading and loading station Rally is”.

source:Irena

 

Oil, gas, petrochemical and refinery

Industrial engineering company Fhamh:

  • Rank A. Country Credit and Banking Consultant Center In the category Feasibility Studies And Monitor the implementation of the project And consumption of resources
  • Has Basic Certificate Capability Consulting Services in Economic Services Specialty And base 1 TECHNICAL INSPECTION From the State Budget and Budget Organization

Design management ؛ GOODS INSPECTION

 

Gurre's pipeline project to Jask

Fahameh , It is proud to be in this national project as a service executive Quality control Pump House Installation Workshop No. 2 Gore-Jacques, Has partnerships and cooperation…(Read more)

 

National justification and production plans

We have to know that Explanatory plan Gives a pristine opportunity to managers before any Investment And waste of resources, consider the planned solutions and with full awareness of what is on the way Investment They are located and provide the right solution and decisions in Justifications Written, the future of their industrial production idea clearly see and from collision…(Read more)