About the construction project of central processing unit (CTEP) Azadegan oil field development plan
Oil and gas
company Petropars In addition to the implementation of challenging projects such as Farzad gas field, it is the only Iranian company that has stepped beyond the country's borders and participated in North Cabinda projects. (Angola) and double-crossing (Venezuela) has also worked. Petropars is the first Iranian contractor to finance its projects and projects, relying on the power of Niko Company (NICO) As its only shareholder and other resources, it is able to provide the projects needed by the projects.
Iran Petropars Company In 2001, as a project-oriented organization in the implementation Projects of oil, gas and petrochemical industries And as a contractor Engineering, purchase and construction or contract management was established in line with the goals of Petropars Group. Based on the experience gained during the implementation of the Phase 19 project, this company is a trusted and capable contractor in oil industry is known.
Excellent supervision
South Azadegan Common Square It is located near the Iraqi border and about 80 kilometers west of Ahvaz. After handing over the management of the South Azadegan Square development project (MC) To Petropars, the contract for the construction and operation of the central processing unit of this field is also in the form of the EPCC contract, between the oil engineering and development company. (text) and Petropars was signed.
Engineering inspection
The process of processing or ctep It is responsible for separating gas, water, salt and other materials available from crude oil and will have a very important role in the development of the joint field of South Azadegan. The projected unit is 6,000 barrels per day and the financial ceiling is intended for its implementation of € 5 million, including engineering services, supplying services, equipment and equipment..
TECHNICAL INSPECTION
Industrial engineering company Fhamh، Base 1 technical inspection and economic services from Program and budget organizationWith nearly 30 years of experience! Specialized service provider in Oil, gas, petrochemical and refinery industries is the country.Fahameh As a contractor for human resource supply services in piping, mechanical, electrical, instrumental, welding-Joint Control System and establishment DOC Document Control Center separately in technical offices and Quality control Located in CTEP site , has participated and cooperated.
You can see the progress of the Central Processing Unit project in South Azadegan Square (CTEP) particle for direct object Here Please note.
In order to implement Central processing unit project (CTEP) In the first phase Development of South Azadegan oil field, Oil and gas from the wells of the wells through the central collection units (Manifold) And the units of gas segregation from oil (MR) North and south collected and transferred to central processing unit. In Central processing unit, Water and salt and sediments from crude oil, vapor pressure (RVP) And the level of sulfur (H2S) It is set to access export oil specifications and then crude oil is transferred to the West Karun Reinforcement Pump. The gas has also been compressed and after desalination to the liquefied gas factory (NGL 3200) Transmitted, water from these processes to water wells (Disposal wells) They are injected, the capacity of the refinery is 6,000 barrels of oil and 2 million cubic feet of gas per day..
Fahame is proud to build in this big project Central processing unit (CTEP) The Azadegan oil field development project has participated and cooperated as a contractor for the services of the technical and quality control office and the document control center..